Close

Sun Subscriber Website Login






Please wait....
 
News Story
Updated: 08/08/2013 08:00:11AM

Roadwatch

Share this story:


Provided by FDOT

Text Size:


U.S. Highway 17 from south of SW Collins Street in Fort Ogden to County Road 760A south of Nocatee — Work is under way to expand US 17 to four lanes. Work will include clearing land for two new travel lanes to the east of the existing US 17 travel lanes, starting drainage activities and relocating overhead power transmission and distribution lines. No lane closures will be required for this work. Motorists are advised to be aware of work vehicles entering and exiting the roadway and delivery of power poles throughout the week. Motorists should observe the posted speed limit and to drive with caution. Project completion is expected at the end of 2015. The contractor is Ajax Paving Inc.

U.S. Highway 17 from CR 760A to north of Flanders Street in Nocatee — The contractor will be trimming and removing trees ahead of FPL, who will be installing new power poles and removing existing power poles and lines. Intermittent daytime lane closures may occur while crews are working. Motorists should use caution while in the area and expect possible delays.

You are currently not logged in
By logging in you can see the full story.

Subscribe to 
							the E-Edition
Get the Sun Delivered


ADVERTISEMENT